Project Information
New Zealand Steel in partnership with the New Zealand Government and Contact Energy have commenced the construction of a new $300m electric arc furnace at the Glenbrook steel mill. This new electric arc furnace will reduce the country’s annual CO2 emissions by 1%! The new furnace design will see it grafted on to the existing plant.
Project description
March Construction’s scope of this project comprised:
- Working with the Beca team to optimise the piling design by providing constructability reviews.
- 187nr bored piles ranging in diameter from 600 to 1050mm to a maximum depth of 30m, all from within the existing furnace hall
- 43nr bored piles in low head room configuration utilising polymer support fluid.
Techniques Used:
Bored piles, Support Fluid
Period of works:
May-November 2024
value:
$4.4m
0nr
piles
0lm
basalt rock
0m
head room
0%
reduction to NZ’s CO2