Project Information

 

As part of the wider City Rail Link project, the C1 enabling works contract comprised the extension of the Britomart rail station and tunnels under the existing historic Central Post Office (CPO) Building using the cut & cover method without disruption to rail services or damage to the structure or surroundings. 

 

 

Project description

The scope of this project comprised: 

  • 3155sq.m 600mm & 800mm thick diaphragm walls constructed in 6.5m headroom and confined access for retention and underpinning the building
  • 58No. 1.4m diameter jet grout columns where the installation of a diaphragm wall was not possible due to the existing structure
  • Construction of rail tunnels for the City Rail Link (CRL) project beneath the existing Central Post Office (CPO) “Britomart” building
  • Developing a Reconstruction of CPO basement and ground floors, including the installation of underpinning structures to transfer the 14,000-ton 100-year-old CPO building from its original foundations onto new foundations.

 

 

Client:
City Rail Link Ltd

 

Engineer:
AURECON

 

Techniques Used:
Dwall, Jetgrout, Secant piles, Bored piles

 

Period of works:
2015-2020

 

value:
$59m

 

0sq.m
Diaphragm Wall
0m
Head room
0ton
Weight of Building
0year-old
Age of building

Related projects

You have a project?

Talk to one of our technical experts on how we can assist you with your geotechnical or water infrastructure needs

You have a project?

Talk to one of our technical experts on how we can assist you with your geotechnical or water infrastructure needs