Project Description
Project Information
The Tuam St project involved the replacement of an old brick barrel pipeline with a new DN1200 plastilined concrete pipe along with associated manholes and service relocation.
Project Description
The scope included sewer diversion of the normal flows through the old brick barrel, breaking out of the existing sewer, construction of the new pipeline, construction of new manholes, watermain relocation and local sewer relocation.
Owner:
Christchurch City Council
Engineer:
CCC
Period of works:
2019-2021
Technique implemented:
Sheetpile open trenching, concrete construction
Value:
$12m